Simulation of extraction rate and scheduling based on geological and quality models as a method of mine planning in modern mining

Bibliographic Details
Main Authors: Olszówka, Krzysztof (Author), Orzechowski, Filip (Author)
Format: Article
Language:English
Subjects:
Source: 1. Górnictwo i geoinžynieria 1. 1732-6702 1. Roč. 29, č. 3/2 (2005), s. 77-85
LEADER 01207nab#a2200349#ar4500
001 000080437
003 SVKKK
005 20060831165002.0
008 050331c2005 pl e eng
FMT
015 |a SNBRB2006/08-ccccc 
038 |a SVKKK 
040 |a SVKKK  |b slo  |e AACR2 
041 0 |a eng  |b eng  |b pol 
044 |a pl  |c PL 
080 |a 004.942  |2 1997 
080 |a 622.014  |2 1997 
100 1 |a Olszówka, Krzysztof  |4 aut 
242 1 0 |a Simulácia rýchlosti dobývania a rozvrhovania založená na geologických a kvalitatívnych modeloch ako metóda plánovania ťažby v modernom baníctve 
245 1 0 |a Simulation of extraction rate and scheduling based on geological and quality models as a method of mine planning in modern mining  |c Krzysztof Olszówka, Filip Orzechowski 
300 |b Obr., tab. 
504 |a Bibliogr. odkazy 
504 |a Res. angl., poľ. 
650 0 4 |a plánovanie ťažby  |x rozvrhovanie časové  |x modelovanie  |x technológie informačné 
700 1 |a Orzechowski, Filip  |4 aut 
773 0 |t Górnictwo i geoinžynieria  |x 1732-6702  |g Roč. 29, č. 3/2 (2005), s. 77-85 
958 |a NB 
992 |a RBX 
BAS
852 |a SVKKK  |b BIB 
EXP
998 |a BAN